Vestas Wind Technology Recruitment of Engineer | Oct 2015 | Chennai

About The Company :

Since Vestas was founded in 1979, Vestas has achieved a market-leading position with more than 60 GW of installed wind turbines or around 19% of total global capacity. Every day, everyone at Vestas works to make Vestas the undisputed global wind leader and the world’s energy mix more sustainable – join us, and be part of ensuring a sustainable future for our planet.

By joining Vestas, you join the only global energy company dedicated 100% to wind energy. Together with our customers, we have installed more than 51.000 turbines in over 70 countries, and we remain committed to increase that number via our superior, cost-effective wind technologies, products and services.

Company Name : Vestas Wind Technology India Pvt Ltd

Company Website : www.vestas.com

Job Location : Chennai

Position : Engineer – Remote Operations Center

Job Role : Technical Support

Last date to apply : ASAP before the link expires

Eligibility Criteria :

  • BE / Diploma in MECH / EEE / ECE [OR] B.Sc Physics / Mathematics.
  • Fresher or Experience , WTG Technicians, BPO, Call Centre .

Skills Required :

  • Good Analytical skill and knowledge
  • Good communication skills in English both written and oral.
  • Flexible regarding work hours due to sites in Europe and US.
  • Good Knowledge in Word, Excel & PowerPoint

Job Description :

The Global Remote Operations Centre – APAC System operates 24×7 – VestasTurbineWatch™. This system helps to increase the productivity and availability of the turbines by immediate action on abnormalities occurred in WTG’s during unmanned conditions The Global ROC -APAC monitors turbine under Asia Pacific & China. We are offering a career opportunity in Vestas, under ROC –APAC, department. This department is in operation since 2005 and having a great value add to Customer.

Responsibilities:

  1. Monitoring 2000 Turbine of 56 wind farms across 9 countries
  2. 24 x7 – Three shifts in day, rotational
  3. Monitoring the wind farms using Vestas proprietary Software tools, .
  4. Refer Standard Documents – Surveillance FAQ / VGA for every action
  5. Reset & Restart the WTG as per the guideline document or notify to site as per the Protocol.
  6. Regular communication with Wind farm Technicians on Emails and Phone calls
  7. Provide periodic updates in the routine work and any deviations are recorded.
  8. Ensures all relevant internal controls are followed
  9. Report Generation – Daily, Weekly & Monthly as per the internal customer’s request
  10. Focus on high standard of quality and safety wherever required
  11. Adhere to Vestas Standards Policies

Click Here to Apply

Previous postIndian Army Recruitment of Officers TES – 35 @ Across India
Next postL & T Infotech Campus Hiring Eligibility Criteria and Placement Paper

LEAVE A REPLY

Please enter your comment!
Please enter your name here

This site uses Akismet to reduce spam. Learn how your comment data is processed.